Moose Power / Dream Industrial rooftop solar portfolio (six Guelph sites)
Council supported the project for procurement on Oct. 15, 2025.
Guelph Council Planning adopted municipal support for a grouped proposal of six rooftop solar installations on existing buildings at 30 Hanlon Creek Boulevard, 35 Cooper Road, 54 Phelan Court, and three Quarterman Road properties. City staff reported 23.25 MW of proposed combined capacity. The October 15 resolution passed 11–0; it enables an IESO LT2 Energy bid but grants no separate planning approval or procurement award.
- Municipality
- City of Guelph
- Decided by
- Council Planning
- Meeting date
- Developer
- Dream Industrial Canada Solar Incorporated (Moose Power Inc.)
- Type
- Solar
- Size
- 23.25 MW, 23.25 MW proposed combined rooftop solar capacity across six existing industrial properties, per City staff report 2025-471; not awarded contract capacity.
- Procurement
- IESO LT2 Window 1 (Energy, LT2(e-1))
- Vote
- 11–0 (Council Planning consent agenda, item 6.3)
What this decision does and does not do
A support resolution or confirmation lets the developer bid into an IESO procurement. It is not a planning approval: zoning, site plan and provincial permits still apply if the project wins a contract.
Sources
Official meeting minutes linked. About evidence classifications.
- Council Planning Minutes, October 15, 2025, item 6.3: Moose Power municipal support resolution (pp. 4–5; carried 11–0)City of Guelph · Official meeting minutes
- Staff report 2025-471, October 15, 2025: six rooftop locations and combined 23.25 MW proposed capacity (pp. 1–2)City of Guelph · Official background (not proof of vote)
Spot an error? Send a correction with a link to the record that shows it.